Pure Crepe Silk High-Low Button Skirt – Elastic Waist, Drawstring Fit
High-Low Button Skirt for Women
Flowy Silhouette • Adjustable Waist • Effortless Style
Add a stylish twist to your wardrobe with this beautiful high-low skirt for women. Designed with a flattering uneven hemline, the skirt falls longer at the front and back while rising slightly at the sides, creating a graceful, flowing silhouette that beautifully showcases the legs without compromising on coverage.
|
✨
Flattering High-Low HemThe unique asymmetric hem is longer at the front and back and shorter at the sides, giving the skirt a stylish, flowing shape with beautiful movement. |
🤎
Button DetailingDecorative buttons add character and visual interest while enhancing the overall fashionable appearance of the skirt. |
|
🎀
Elasticated WaistA soft elasticated waistband provides comfortable flexibility and makes the skirt easy to slip on and wear throughout the day. |
🌿
Adjustable DrawstringsFunctional drawstrings allow you to adjust the waist for a more comfortable and personalized fit. |
One Skirt, Endless Styling Possibilities
Pair it with a fitted top, crop top, blouse, tank or casual tee. Style it with sandals for a relaxed daytime look or dress it up with heels, jewellery and accessories for evenings, vacations, parties or special outings.
Designed for Comfort & Movement
The combination of a flowing high-low silhouette, soft elasticated waist and adjustable drawstrings makes this skirt an easy choice for comfortable, effortless everyday styling.
Product Highlights
✓ Stylish high-low asymmetric hemline
✓ Longer at the front and back, shorter at the sides
✓ Elegant button detailing
✓ Soft and comfortable elasticated waistband
✓ Adjustable drawstrings for added convenience
✓ Flowy silhouette with easy movement
✓ Suitable for casual, vacation and occasion styling
Customize your dress with us
Need custom sizing, bespoke embroidery, or specific saree fabric selections from our vault? Submit your customization preferences below or connect directly on WhatsApp!